← Back to opportunities

Team Manager

📍 Location
Neemrana
⏰ Job Type
Full Time, Permanent
📅 Posted
June 14, 2026

About the Role

Roles and Responsibilities

1) Timely Execution of new models in
frame assembly, Final Inspection and
OBL to fulfil the business Process Planning and execution of facility Conducting Pre production Manpower Preparation of SOP & multi model Development cost within target % Start of production timeline
adherence Achievement of straight pass as per
defined parameters (Q)2) Execution of ECN's in Mass
Production (Frame Implementation of Process Flow Updation basis Failure Modes (PFMEA) Updation basis Standard Operating procedures (SOP) Updation
basis Work Content Updation basis Consumable Norms Infrastructure Observation Execution of ECN's as per plan.Productivity Improvement throughWaste Elimination & Automation in
Frame Assy Lines 1&2, Final Inspection
and Work content balancing and reduction in frame
Assy model Monitoring stage wise manpower Audit of stage wise manpower Identify bottleneck and do SMS reduction in Frame Variabl...

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position