← Back to opportunities

Support Loader and Wheeled Dozer Operator

📍 Location
Geraldton
⏰ Job Type
Full-time
📅 Posted
March 20, 2026

About the Role

The Greenstone Mine commenced production in May 2024 and will be one of Canada's largest open-pit gold mines, with annual production expected to average nearly 400,000 ounces of gold per year for an initial 14-year mine life with additional potential from a large underground deposit. Greenstone Gold Mines LP is owned by Equinox Gold Corp, a Vancouver-based mining company with five operating mines in Canada, the United States, Mexico and Nicaragua.

Job Summary

We are seeking a Support Loader and Wheeled Dozer Operator to join our team. Reporting to the Mine Operations Supervisor, the Support Loader and Wheeled Dozer Operator is responsible for safely and productively operat...

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position