← Back to opportunities

Superintendent - Data Center Construction

📍 Location
Phoenix, Arizona
⏰ Job Type
Full-time
📅 Posted
May 16, 2026

About the Role

Job Summary: The Superintendent is responsible for supervising on-site construction of a project(s) at one or more locations and serves as the General Contractor's representative on the jobsite(s) under the direction and in partnership with the CM and the PM. Must ready to travel approx 70% across different site locations such as Phoenix, AZ, Chicago, IL and Santa Clara, CA.



Essential Duties and Responsibilities:


  • ...

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position