← Back to opportunities

Sr Program Cost Scheduling & Control Analyst - Earned Value

📍 Location
Colombia
⏰ Job Type
Full time
📅 Posted
June 27, 2026

About the Role

Sierra Space Careers:

At Sierra Space, we build the missions and systems that keep our world secure in the domain above Earth.

Sierra Space team members share a spirit of innovation and collaboration and a belief that we can deliver on the boldest missions in space today. Together with our customers, we aim to safeguard our nation, sustain human presence in space, and secure the freedom of operations in low Earth orbit and beyond.

Our success is measured by the trust of those who rely on what we build and deliver, and our technologies keep the United States and its allies mission-ready throughout space.

We are mission-driven, and together, we are an extraordinary team.

About the Role

The Sr Program Cost Scheduling & Control Analyst – Earned Value, is responsible for leading the planning and scheduling efforts for complex programs and projects. This role involves performing detailed analyses and preparing co...

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position