← Back to opportunities

Oracle Primavera Software Engineer

📍 Location
Hyderabad
⏰ Job Type
Full Time/Permanent
📅 Posted
June 07, 2026

About the Role

• Resource and cost analysis & cost engineering experience on EPC projects
• Familiar with Primavera P6 and Unifier (version 19..12.7)
• Knowledge of Earned Value Analysis, Cost Forecasting, and Cost Analysis
• BS in Engineering, Business, Finance, Accounting, or Construction Management
• Prefer knowledge of Construction Management and Cost Control Systems
• Knowledge of ERP/EPM is a plus

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position