← Back to opportunities

Operation Controller (Koblingsleder) d/f/m

📍 Location
Holstebro
⏰ Job Type
full time
📅 Posted
June 03, 2026

About the Role


RWE Renewables Denmark A/S
To start in July 2026, full time, permanent

RWE is building Denmark’s largest offshore wind farm. Thor offshore wind farm (TOWF) will be built 22 kilometres off the coast of Thorsminde with a capacity of more than 1 GW. 72 units of Siemens Gamesa’s flagship SG 14-236 DD offshore wind turbines are planned to be installed. Once fully operational in 2027, Thor will produce green electricity to more than 1 million Danish households.

You will be one of two Operation Controllers (Koblingsleder) for the offshore teams, with main responsibility for safe electrical operation from the local control room in Thorsminde. You will work closely with the maintenance coordinator, engineering team, grid owner and technicians on site. As part of daily operation, you will ensure correct planning, SCADA monitoring, HV switching and electrical worksite preparation in accordance with BEK 1608 and the applicable electrical safety rules.

Du...

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position