← Back to opportunities
📍 Location
madrid
⏰ Job Type
Full-time
📅 Posted
June 07, 2026

About the Role

A leading engineering firm in Madrid is seeking an Electrical Project Intern to assist in supervising subcontractors and ensuring compliance with safety standards on a Datacenter project. The internship lasts 4 to 6 months, with the potential for permanent employment. Candidates should be students in an engineering school specializing in Electrical, demonstrating strong organizational skills and a passion for technical challenges. The company promotes an inclusive work environment and values diversity.
#J-18808-Ljbffr

Ready to Join Through a Referral?

Apply now and get connected directly with the hiring team

Apply for this Position